Showing posts with label Boogie Time. Show all posts
Showing posts with label Boogie Time. Show all posts

Sunday, June 1, 2008

June Gift List

Cross posted at Sally Comes Unraveled and Year Long Gift-A-Long.

I made very little progress in May, but I feel a breakthrough coming on.

May Wrap Up:

1. Gift Item: A lace shawl. This is my large project for the second quarter challenge. (Rollover)
Progress: I actually did some useful swatches. I'm going to post more details later.

2. Gift Item: Finish Boogie Time (2 of them) (Rollover)
Progress: I'm still stuck. I still need a watch face that works for a boy.

3. Gift Item: Rainbow Socks (Rollover)
Progress: I finally found the sock!

4. Gift Item: Jen's Purse (secret knitting - Rollover)
Progress: I bought the yarn, now I need to knit it.

5. Gift Item: Dad's Topo Chico Cozy (Mystery Knitting/Felting)
Progress: finished.

June Gift List:

1. Gift Item: A lace shawl. I'm really going to finish it! (Rollover - Again)
Recipient: Grandma
Occasion: Christmas
Deadline: June 2008, for the Second Quarter Challenge.

2. Gift Item: Finish Boogie Time (2 of them) (Rollover - Again)
Recipient: Family Friends
Occasion: last Christmas
Deadline: Overdue

3. Gift Item: finish my sister's socks (rollover - Again)
Recipient: Sister
Occasion: Birthday
Deadline: Overdue

4. Gift Item: Jen's Purse
Recipient: Friend
Occasion: Birthday
Deadline: Overdue

5. Gift Item: Socks
Recipient: Male Relative
Occasion: Christmas
Deadline: Let's say December 18, to give me enough time to mail it.

Wednesday, April 30, 2008

May Gift List

Cross posted at Sally Comes Unraveled and Year Long Gift-A-Long.

Lots of stalling in April. I'm stuck in a couple of my projects.

April Wrap Up:

1. Gift Item: A lace shawl. This is my large project for the second quarter challenge.
Progress: Still no work since this pathetic swatch. I'm looking for the needles I want to use.

2. Gift Item: Finish Boogie Time (2 of them) (Rollover)
Progress: I'm still stuck. I still need a watch face that works for a boy.

3. Gift Item: Rainbow Socks (Rollover)
Progress: I haven't done any work on this since I lost the sock! (I'll find it eventually.)

4. Gift Item: Fetching (Rollover)
Progress: Finished

5. Gift Item: Mystery Crochet
Progress: I crocheted a red blood cell for my Mom's birthday. It's finished.

May Gift List:

1. Gift Item: A lace shawl. This month I want to settle on a yarn, pattern and needles, then knit a swatch, block it and cast it on. (Rollover - Again)
Recipient: Grandma
Occasion: Christmas
Deadline: June 2008, for the Second Quarter Challenge.

2. Gift Item: Finish Boogie Time (2 of them) (Rollover - Again)
Recipient: Family Friends
Occasion: last Christmas
Deadline: Overdue

3. Gift Item: finish my sister's socks (rollover - Again)
Recipient: Sister
Occasion: Birthday
Deadline: Overdue

4. Gift Item: Secret Knitting
Recipient: Friend
Occasion: Birthday
Deadline: Late May

5. Gift Item: Secret Knitting/Felting
Recipient: Top Secret!
Occasion: Birthday
Deadline: Late May

Tuesday, April 1, 2008

April Gift List

Cross posted at Sally Comes Unraveled and Year Long Gift-A-Long.

Yeah, so March kind of sucked as far as gift knitting.

March Wrap Up:

1. Gift Item: A lace shawl. My goal this month is to make decisions. This month I want to settle on a yarn, pattern and needles, then knit a swatch and block it.
Progress: No work since this pathetic swatch.

2. Gift Item: Finish Boogie Time (2 of them) (Rollover from February)
Progress: I'm stuck. I need a watch face that works for a boy.

3. Gift Item: Socks (rollover from February)
Progress: I can now say these are Rainbow Socks for my sister, and I've only gotten this far:



4. Gift Item: Brioche Rib Scarf
Progress: Finished

5. Gift Item: Either Fetching or Foliage, whichever I'm in the mood for.
Progress: I chose Fetching, and I've gotten a little farther since I took this picture:



April Gift List:

1. Gift Item: A lace shawl. This month I want to settle on a yarn, pattern and needles, then knit a swatch, block it and cast it on. (Rollover - Again)
Recipient: Grandma
Occasion: Christmas
Deadline: Let's say December 18, 2008 (so I have enough time to get it in the mail.)

2. Gift Item: Finish Boogie Time (2 of them) (Rollover - Again)
Recipient: Family Friends
Occasion: last Christmas
Deadline: Overdue

3. Gift Item: finish my sister's socks (rollover - Again)
Recipient: Sister
Occasion: Birthday
Deadline: Overdue

4. Gift Item: Fetching (Rollover)
Recipient: Unknown (stockpiling for Christmas)
Occasion: Christmas
Deadline: Let's say December 18, 2008 (so I have enough time to get it in the mail.)

5. Gift Item: Mystery Crochet
Recipient: Top Secret!
Occasion: Top Secret!
Deadline: April

Monday, March 10, 2008

Startitis

A lot of people are using March to finish up lingering project. However, I seem to be letting them pile up. I have Startitis and I'm not doing anything about it.

It's time for a WIP round up.

This is the first time the Rainbow Socks have made an appearance on my blog. That's because they are a birthday gift for my sister, and since I've already done the old wrap-a-pair-of-unfinished-socks-for-a-gift trick, I can now reveal them to the world.

These socks have had bad mojo so far. They were slow to start, I kept forgetting them at home as I was trying to make the birthday deadline, and they keep coming off the needles. (I need to get my dpn holder thingy out again.) Although I consider myself pretty good with short rows, these aren't quite right, which is causing puckers. (Even after reading this helpful tutorial.)

Each short row section is supposed to have four unworked stitches left in the round before finishing the section. The first short row section was fine, but ever since then I end up with either two, six or at one point three stitches left. I kept counting them over and over again, and everything added up.

But just now, as I was getting the socks out for a picture, a needle came out (again) and suddenly I was stitch short and I have no idea where it went.

So these are going into time out until I can input from my sister (to see how picky she is) and my Mom (to figure out where I went wrong.)

I've dubbed these two Boogie Time watches "Even More Boogie Time" To differentiate them from all the other Boogie Time watches I've made. These are really late Christmas gifts.

As you can see, I've cast off, but they still need to be sewn up. However, the real problem has been finding a watch face that will work for a boy for the striped one. (No luck at all the thrift stores I've checked so far.)

Way back in January, I talked about "starting" the Candy sweater from Knitty? Yeah, I haven't made it past the swatch. I haven't even blocked the swatch. (And I want to be sure to block the swatch to be sure of the gauge before I do the math....yada yada yada.)

Strangling Vines continues to get the most attention these days, even when there are birthday gifts to knit, etc. It is a total luxury project, and it's just for me. (And it will be less puckery after blocking.)

This isn't even counting the "inactive" projects, the secret design I have planned, my plans for Silk Cotton that are forming in my head, the projects I owe other people that aren't technically "gifts," etc.

And with all this going, what am I going to work on before I go to bed?

I'm casting on (or at least winding the yarn for) Fetching to join all the Malabrigo March Madness on Ravelry.

Bits and Pieces


This link came up on my Gmail today. I have no idea why. And are these really any better than band aids?

I’m having all sorts of computer problems tonight. For now, I’m blaming the weather, because that does not require tech support from my cable company. Some sites just don’t want to load, including Blogger. (I’m typing this on a word doc so I can cut and paste later.)

Quote of the day:
“Home is the place where, when you have to go there, they have to take you in.” – Robert Frost (recently seen on Knitgrrl’s blog)

Hi, Mom. *waves*

Friday, February 29, 2008

March Gift List

Cross posted at Sally Comes Unraveled and Year Long Gift-A-Long.

Here's some housekeeping stuff for the Year Long Gift-A-Long.

February Wrap Up:

1. Gift Item: A lace shawl. My goal this month is to make decisions. This month I want to settle on a yarn, pattern and needles, then knit a swatch and block it.
Progress:I worked on it, but made no real decisions.

2. Gift Item: Scarf (already in progress)
Progress: finished

3. Gift Item: Boogie Time (2 of them)
Progress: Rollover: I'm working on them.


4. Gift Item: Socks
Progress: finished

5. Gift Item: Socks (I'm not aiming for completion. Just a good start.)
Progress: Rollover: ummm...haven't started them yet.

March Gift List:

1. Gift Item: A lace shawl. This month I want to settle on a yarn, pattern and needles, then knit a swatch, block it and cast it on. (Rollover from February)
Recipient: Grandma
Occasion: Christmas
Deadline: Let's say December 18, 2008 (so I have enough time to get it in the mail.)

2. Gift Item: Finish Boogie Time (2 of them) (Rollover from February)
Recipient: Family Friends
Occasion: last Christmas
Deadline: Overdue

3. Gift Item: Socks (rollover from February)
Recipient: Top Secret!
Occasion: birthday
Deadline: March 2008

4. Gift Item: Brioche Rib Scarf
Recipient: Unknown (stockpiling for Christmas)
Occasion: Christmas
Deadline: Let's say December 18, 2008 (so I have enough time to get it in the mail.)

5. Gift Item: Either Fetching or Foliage, whichever I'm in the mood for.
Recipient: Unknown (stockpiling for Christmas)
Occasion: Christmas
Deadline: Let's say December 18, 2008 (so I have enough time to get it in the mail.)

Thursday, January 31, 2008

February Gift List

Cross posted at Sally Comes Unraveled and Year Long Gift-A-Long.

Here is my February gift list for the Year Long Gift-A-Long.

1. Gift Item: A lace shawl. My goal this month is to make decisions. This month I want to settle on a yarn, pattern and needles, then knit a swatch and block it.
Recipient: Grandma
Occasion: Christmas
Deadline: Let's say December 18, 2008 (so I have enough time to get it in the mail.)

2. Gift Item: Scarf (already in progress)
Recipient: Top Secret!
Occasion: Valentine's Day
Deadline: February 10, 2008 (so I can get it in the mail.)

3. Gift Item: Boogie Time (2 of them)
Recipient: Family Friends
Occasion: last Christmas
Deadline: Overdue

4. Gift Item: Socks
Recipient: Mom
Occasion: last Christmas
Deadline: Overdue

5. Gift Item: Socks (I'm not aiming for completion. Just a good start.)
Recipient: Top Secret!
Occasion: birthday
Deadline: March 2008

Wednesday, October 3, 2007

FO: Pinky-Purple Boogie Time

I planned to make several Boogie Time watches for the Stash and Burn One Skein Contest, but I only got in two. One is for me, this one will be a gift.

I used a bit of leftover Claudia's Hand Painted Yarn Sport in "Just Plum" leftover from a "mystery" project. I settled on size US 2 bamboo dpns after unraveling it a few times. The watch part is from Jo-Ann.

I also didn't really follow the pattern, just the basic concept. I cast on a number that seemed right, and then knit until it was a length that seemed right.

I did it in one day, the second my second to last entry for the one skein contest.

Tuesday, August 28, 2007

FO: Boogie Time

I checked with the ladies at Stash and Burn said I could enter something in the one skein contest even if I started it before the contest began. (I finished it in the allotted time period.)

So I present, Boogie Time, a project I didn't get done in time for the Knitty Calendar Contest.

This used less than a skein. Waaaayy less than a skein. In fact, it took the leftovers from another one skein project.

I had a tiny bit of Lorna's Laces Lion and Lamb in "Watercolor" leftover. This was very coveted yarn, and I wanted to make the most of it. I watch face was on sale at Joann.

I decided this was the time to finally learn Magic Loop.

Personally, I've used dpns from the beginning. In fact, I tend to use them when normal people use circulars. And my Mom agreed with me: all that extra cable? What's the point? But I wanted to challenge myself. So I got out some long circulars and some acrylic and tried it out.

I got the hang of it. I think I'll try it some more. It is good for hats, sleeves and other things that require changing to shorter needles.

(I think it would have been easier if I'd followed the directions and steamed the cables first.)

I was going to use magic loop for the whole thing, but I had trouble getting a good gauge....












So I switched back to dpns, because I didn't have the size I needed in circulars. (These are size 3 dpns. I know, my gauge is huge.)

So I completely changed the pattern because I was using a completely different gauge. And my wrists are so tiny. But I liked it, and I may make more for gifts.

And the best part....


There's still some leftover.